Eifeh Strom / DigiTimes: IT news from Asia
The first in Taiwan to mass-produce IGBT power semiconductors: QA with Pan Jit COO Edgar Chen – The supply of high-end electronic power semiconductors, such as automotive MOSFETs and IGBTs, continues to be tight with delivery times still at 50 weeks or more. These power components can be produced using mature silicon-based (Si-based) semiconductor manufacturing processes, especially by 8-inch wafer fabs. …